Home Again with Bob Vila - Season 8
1 - Craftsman Bungalow: Project Introduction
Air Date: September 1, 1997
A vintage Sears kit house is restored, but historic and sentimental elements are preserved.
2 - Craftsman Bungalow: Wiring, Plumbing and Plastering
Air Date: September 8, 1997
A closet is transformed into a bathroom, while new and old building materials are blended in the living and dining rooms.
3 - Craftsman Bungalow: Reconditioning the Windows
Air Date: September 15, 1997
Bob Vila oversees the reconditioning of an original window in the Sears kit house. Also: a tour of Frank Lloyd Wright's Hollyhock House.
4 - Craftsman Bungalow: Interior Trim and Porch Framing
Air Date: September 22, 1997
Interior trim details are custom-milled as per the architect's specifications, and original bathroom fixtures are re-porcelainized. Also: framing continues on the back porch.
5 - Craftsman Bungalow: Repairing the Front Facade
Air Date: September 29, 1997
Vintage cabinetry is discovered in a salvage yard and installed in the kitchen; yellow paint is stripped off; and the facade is given a facelift.
6 - Craftsman Bungalow: Swimming Pool and Porch
Air Date: October 6, 1997
The pool crew finishes the rebar and sprays gunnite, while French doors are installed in the master bedroom and the porch roof is repaired.
7 - Craftsman Bungalow: Working On the Pool
Air Date: October 13, 1997
Green Indian slate is installed on the surround and porch steps. Also: the backyard entry gate is finished.
8 - Craftsman Bungalow: Exterior Paint Preparation
Air Date: October 20, 1997
At the Sears kit house, the exterior is stripped for priming and painting. Also: a tour of the CBS studio center.
9 - Craftsman Bungalow: Floor Tile and Cabinet Installation
Air Date: October 27, 1997
The bathroom is tiled, new kitchen cabinets are custom-made to match the vintage ones, and decking is installed on the back porch.
10 - Craftsman Bungalow: Installing Custom Light Grids
Air Date: November 3, 1997
The electrician installs back lighting in the living room, and six stained-glass panels are cut and assembled. Meanwhile, contractors insulate the roof.
11 - Craftsman Bungalow: Installing Cabinets
Air Date: November 10, 1997
A cabinetmaker frames boxes for living-room built-ins to match existing ones in the kitchen, and the pool crew finishes the plaster.
12 - Craftsman Bungalow: Hardwood Floor Repair and Refinishing
Air Date: November 17, 1997
Damaged hardwood flooring is repaired and an alder kitchen countertop is installed. Also: a tour of the Japanese Garden at Huntington Library and tips on building a Zen garden.
13 - Craftsman Bungalow: House Tour
Air Date: November 24, 1997
Bob Vila leads a final tour of the landscaped front yard and the porch addition, which features a barbecue. Also toured are the Zen garden and swimming pool.
14 - Dream Garage: Project Introduction
Air Date: December 1, 1997
Plans for a post-and-beam garage and boat storage project are discussed with an architect. Also: touring a marina with America's Cup champ Bill Koch.
15 - Dream Garage: Working On the Foundation
Air Date: December 8, 1997
Foundation work is begun, while Bob Vila tours an antique car museum in a Shaker-style round barn in Sandwich, MA.
16 - Dream Garage: More Foundation Work
Air Date: December 15, 1997
As the foundation is prepared, Bob Vila explains termite-proofing and oversees the installation of a hydronic heating system.
17 - Dream Garage: Framing the Garage
Air Date: December 22, 1997
A look at framing, and the special techniques and tools that are used for it. Also: a tour of a lumber company examines pre-cut materials for the post-and-beam plan.
18 - Dream Garage: Framing and Decking
Air Date: December 29, 1997
New decking is installed in the loft, while Bob Vila and the crew put up the ridge beam and rafters. Also: a joinery specialist demonstrates house framing.
19 - Dream Garage: Insulating the Garage
Air Date: January 5, 1998
Insulation panels are installed and Bob Vila visits a factory where all-in-one wall product is made.
20 - Dream Garage: Exterior Trim and Siding
Air Date: January 12, 1998
Windows, exterior trim and siding are installed. Also: a tour of the American Plywood Association lab, where quality testing is observed.
21 - Dream Garage: Skylights and Metal Roofing
Air Date: January 19, 1998
Metal roofing is installed and drywall is put up around the skylights.
22 - Dream Garage: Installing Protective Features
Air Date: January 26, 1998
Bob Vila takes a look at such safety features as motion detectors, a fire-suppression unit and a lightning rod.
23 - Dream Garage: Installing a Staircase and Paneling
Air Date: February 2, 1998
A horticulturalist shares general landscaping tips and offers special advice on the use of native plants and trees. Also: building a staircase to the loft.
24 - Dream Garage: Heating and Lighting
Air Date: February 9, 1998
A garage-door opener is installed, the heated-floor system is activated, and interior paneling is stained. Also: track lighting goes in.
25 - Dream Garage: Setting up the Workshop and Garage
Air Date: February 16, 1998
The interior of the barn is stained and a workshop is assembled. Also: race-car driver Lyn St. James helps Bob Vila set up the automotive garage with new tools.
26 - Dream Garage: Barn Tour
Air Date: February 23, 1998
Workbenches are completed and metal shelves are installed in the loft, before Bob Vila leads a tour of the finished barn.