Home Again with Bob Vila - Season 8

← Back to All Seasons of Home Again with Bob Vila
Craftsman Bungalow: Project Introduction

1 - Craftsman Bungalow: Project Introduction

Air Date: September 1, 1997

A vintage Sears kit house is restored, but historic and sentimental elements are preserved.

Craftsman Bungalow: Wiring, Plumbing and Plastering

2 - Craftsman Bungalow: Wiring, Plumbing and Plastering

Air Date: September 8, 1997

A closet is transformed into a bathroom, while new and old building materials are blended in the living and dining rooms.

Craftsman Bungalow: Reconditioning the Windows

3 - Craftsman Bungalow: Reconditioning the Windows

Air Date: September 15, 1997

Bob Vila oversees the reconditioning of an original window in the Sears kit house. Also: a tour of Frank Lloyd Wright's Hollyhock House.

Craftsman Bungalow: Interior Trim and Porch Framing

4 - Craftsman Bungalow: Interior Trim and Porch Framing

Air Date: September 22, 1997

Interior trim details are custom-milled as per the architect's specifications, and original bathroom fixtures are re-porcelainized. Also: framing continues on the back porch.

Craftsman Bungalow: Repairing the Front Facade

5 - Craftsman Bungalow: Repairing the Front Facade

Air Date: September 29, 1997

Vintage cabinetry is discovered in a salvage yard and installed in the kitchen; yellow paint is stripped off; and the facade is given a facelift.

Craftsman Bungalow: Swimming Pool and Porch

6 - Craftsman Bungalow: Swimming Pool and Porch

Air Date: October 6, 1997

The pool crew finishes the rebar and sprays gunnite, while French doors are installed in the master bedroom and the porch roof is repaired.

Craftsman Bungalow: Working On the Pool

7 - Craftsman Bungalow: Working On the Pool

Air Date: October 13, 1997

Green Indian slate is installed on the surround and porch steps. Also: the backyard entry gate is finished.

Craftsman Bungalow: Exterior Paint Preparation

8 - Craftsman Bungalow: Exterior Paint Preparation

Air Date: October 20, 1997

At the Sears kit house, the exterior is stripped for priming and painting. Also: a tour of the CBS studio center.

Craftsman Bungalow: Floor Tile and Cabinet Installation

9 - Craftsman Bungalow: Floor Tile and Cabinet Installation

Air Date: October 27, 1997

The bathroom is tiled, new kitchen cabinets are custom-made to match the vintage ones, and decking is installed on the back porch.

Craftsman Bungalow: Installing Custom Light Grids

10 - Craftsman Bungalow: Installing Custom Light Grids

Air Date: November 3, 1997

The electrician installs back lighting in the living room, and six stained-glass panels are cut and assembled. Meanwhile, contractors insulate the roof.

Craftsman Bungalow: Installing Cabinets

11 - Craftsman Bungalow: Installing Cabinets

Air Date: November 10, 1997

A cabinetmaker frames boxes for living-room built-ins to match existing ones in the kitchen, and the pool crew finishes the plaster.

Craftsman Bungalow: Hardwood Floor Repair and Refinishing

12 - Craftsman Bungalow: Hardwood Floor Repair and Refinishing

Air Date: November 17, 1997

Damaged hardwood flooring is repaired and an alder kitchen countertop is installed. Also: a tour of the Japanese Garden at Huntington Library and tips on building a Zen garden.

Craftsman Bungalow: House Tour

13 - Craftsman Bungalow: House Tour

Air Date: November 24, 1997

Bob Vila leads a final tour of the landscaped front yard and the porch addition, which features a barbecue. Also toured are the Zen garden and swimming pool.

Dream Garage: Project Introduction

14 - Dream Garage: Project Introduction

Air Date: December 1, 1997

Plans for a post-and-beam garage and boat storage project are discussed with an architect. Also: touring a marina with America's Cup champ Bill Koch.

Dream Garage: Working On the Foundation

15 - Dream Garage: Working On the Foundation

Air Date: December 8, 1997

Foundation work is begun, while Bob Vila tours an antique car museum in a Shaker-style round barn in Sandwich, MA.

Dream Garage: More Foundation Work

16 - Dream Garage: More Foundation Work

Air Date: December 15, 1997

As the foundation is prepared, Bob Vila explains termite-proofing and oversees the installation of a hydronic heating system.

Dream Garage: Framing the Garage

17 - Dream Garage: Framing the Garage

Air Date: December 22, 1997

A look at framing, and the special techniques and tools that are used for it. Also: a tour of a lumber company examines pre-cut materials for the post-and-beam plan.

Dream Garage: Framing and Decking

18 - Dream Garage: Framing and Decking

Air Date: December 29, 1997

New decking is installed in the loft, while Bob Vila and the crew put up the ridge beam and rafters. Also: a joinery specialist demonstrates house framing.

Dream Garage: Insulating the Garage

19 - Dream Garage: Insulating the Garage

Air Date: January 5, 1998

Insulation panels are installed and Bob Vila visits a factory where all-in-one wall product is made.

Dream Garage: Exterior Trim and Siding

20 - Dream Garage: Exterior Trim and Siding

Air Date: January 12, 1998

Windows, exterior trim and siding are installed. Also: a tour of the American Plywood Association lab, where quality testing is observed.

Dream Garage: Skylights and Metal Roofing

21 - Dream Garage: Skylights and Metal Roofing

Air Date: January 19, 1998

Metal roofing is installed and drywall is put up around the skylights.

Dream Garage: Installing Protective Features

22 - Dream Garage: Installing Protective Features

Air Date: January 26, 1998

Bob Vila takes a look at such safety features as motion detectors, a fire-suppression unit and a lightning rod.

Dream Garage: Installing a Staircase and Paneling

23 - Dream Garage: Installing a Staircase and Paneling

Air Date: February 2, 1998

A horticulturalist shares general landscaping tips and offers special advice on the use of native plants and trees. Also: building a staircase to the loft.

Dream Garage: Heating and Lighting

24 - Dream Garage: Heating and Lighting

Air Date: February 9, 1998

A garage-door opener is installed, the heated-floor system is activated, and interior paneling is stained. Also: track lighting goes in.

Dream Garage: Setting up the Workshop and Garage

25 - Dream Garage: Setting up the Workshop and Garage

Air Date: February 16, 1998

The interior of the barn is stained and a workshop is assembled. Also: race-car driver Lyn St. James helps Bob Vila set up the automotive garage with new tools.

Dream Garage: Barn Tour

26 - Dream Garage: Barn Tour

Air Date: February 23, 1998

Workbenches are completed and metal shelves are installed in the loft, before Bob Vila leads a tour of the finished barn.