Home Again with Bob Vila - Season 9

← Back to All Seasons of Home Again with Bob Vila
Accessible Home: Housing Project Introduced

1 - Accessible Home: Housing Project Introduced

Air Date: September 7, 1998

In a neighborhood outside of Boston, work begins on an affordable housing unit for a person with disabilities. Included: soil decontamination and foundation excavation.

Accessible Home: Framing and Shingling

2 - Accessible Home: Framing and Shingling

Air Date: September 14, 1998

Asphalt shingles and flashing are added to the roof, and walls are prepped with special blocking for mounting safety handrails. Also: tips on paneling and working with a culturally diverse crew.

Accessible Home: Installing Siding

3 - Accessible Home: Installing Siding

Air Date: September 21, 1998

A special weather- and fire-resistant siding is installed. Also: finishing the basement work and running electrical wiring.

Accessible Home: Insulation and Door Installation

4 - Accessible Home: Insulation and Door Installation

Air Date: September 28, 1998

Insulation work is begun and trenches are dug for the new water service. Also: Boston Mayor Thomas Menino stops by to help install the front door.

Accessible Home: Designing for the Disabled

5 - Accessible Home: Designing for the Disabled

Air Date: September 28, 1998

Bob Vila talks with experts to understand the difference between adaptability and accessibility when designing homes for disabled people.

Accessible Home: Building the Railing System

6 - Accessible Home: Building the Railing System

Air Date: October 12, 1998

The railing system is built and integrated with the front porch columns. Also: a tour of Boston's Roxbury community, making a comeback from urban blight.

Accessible Home: Building the Railing System Stairs

7 - Accessible Home: Building the Railing System Stairs

Air Date: October 19, 1998

Landscaping begins, the modular stair system is anchored, and the front porch ramp is built.

Accessible Home: Installing a Tankless Water Heater

8 - Accessible Home: Installing a Tankless Water Heater

Air Date: October 26, 1998

Recessed lighting and a cost-effective tankless water heater are installed. Also: a tour of a lighting manufacturing plant.

Accessible Home: Shower Stall and Drywall

9 - Accessible Home: Shower Stall and Drywall

Air Date: November 2, 1998

Drywall goes up and plumbing begins on a shower stall designed for wheelchair users. Included: a field trip to learn about new trends in community living.

Accessible Home: Accessible Fixtures and Elevator

10 - Accessible Home: Accessible Fixtures and Elevator

Air Date: November 9, 1998

The elevator is put in, and bathroom fixtures are installed along with hardware specially designed for people with disabilities.

Accessible Home: Energy Efficiency Discussion

11 - Accessible Home: Energy Efficiency Discussion

Air Date: November 16, 1998

The energy-efficient boiler is installed, and Bob Vila heads to Germany for a tour of the plant where the boiler was made.

Accessible Home: Lockset Installation

12 - Accessible Home: Lockset Installation

Air Date: November 23, 1998

A specially designed lock set is installed, along with an energy-efficient, side-by-side washer-dryer.

Accessible Home: Accessible Unit Tour

13 - Accessible Home: Accessible Unit Tour

Air Date: November 30, 1998

Bob Vila tours the completed unit, paying special attention to the wheelchair-accessible kitchen with energy-efficient appliances.

Loft Conversion: Loft Conversion Initial Tour

14 - Loft Conversion: Loft Conversion Initial Tour

Air Date: December 7, 1998

Conversion of an old fur storage building into a residential loft begins in Boston's Leather District. Included: a walking tour of other well-preserved antique commercial buildings in the neighborhood.

Loft Conversion: Plumbing, Heating and the 'Big Dig'

15 - Loft Conversion: Plumbing, Heating and the 'Big Dig'

Air Date: December 14, 1998

Installation of plumbing and heating begins. Included: a look at the progress of Boston's famous highway project, the 'Big Dig'.

Loft Conversion: Plastering the Loft

16 - Loft Conversion: Plastering the Loft

Air Date: December 21, 1998

Plastering is begun on the project, while Bob Vila takes a trip to Cambridge to meet a landscape architect who converted an industrial building into a spacious home and office.

Loft Conversion: Elevating the Kitchen and Bedroom

17 - Loft Conversion: Elevating the Kitchen and Bedroom

Air Date: December 28, 1998

A platform is built to raise the kitchen and bedroom above floor level. Included: a visit to a nearby finished loft.

Loft Conversion: Paint and Plate Glass Windows

18 - Loft Conversion: Paint and Plate Glass Windows

Air Date: January 4, 1999

The entryway and foyer are painted, and the plate glass windows are replaced throughout. Work on the bathroom begins with shower tile installation and lavatory plumbing.

Loft Conversion: Framing a Wall With Built-in Cabinets

19 - Loft Conversion: Framing a Wall With Built-in Cabinets

Air Date: January 11, 1999

Bob Vila addresses the challenge of framing and plastering a 48-foot wall with an almost imperceptible curve. Plus, built-in cabinets are constructed.

Loft Conversion: Installing Plumbing Fixtures

20 - Loft Conversion: Installing Plumbing Fixtures

Air Date: January 18, 1999

The bathroom progresses with the installation of an electrically powered full-body shower tower, a dual-speed pressurized toilet, and a glass lavatory.

Loft Conversion: Installing Stainless Steel Countertops

21 - Loft Conversion: Installing Stainless Steel Countertops

Air Date: January 25, 1999

Installation of the restaurant-style kitchen is begun, and Bob Vila tours the fabrication shop where the steel materials being used were custom-made.

Loft Conversion: Drywall and Plastering Tips

22 - Loft Conversion: Drywall and Plastering Tips

Air Date: February 1, 1999

Bob Vila offers tips on installing precision drywall and plastering in tricky places. Plus, a bookshelf nook is built and stainless steel appliances are installed.

Loft Conversion: Installing Track Lighting

23 - Loft Conversion: Installing Track Lighting

Air Date: February 8, 1999

Finishes are installed in the bathroom and elsewhere in the loft, track lighting is put in. Included: a tour of Lightolier's Tech Center to learn about the power of light to change the mood of a space.

Loft Conversion: Building a Closet System

24 - Loft Conversion: Building a Closet System

Air Date: February 15, 1999

Architect Greg Rochlin is on-site to oversee the fabrication of the hallway closet system-- a multicolored design pieced together in Formica laminate. Lighting designer Markus Earley returns with some snazzy fixtures and controls, and the stackable Maytag washer/dryer unit is installed in the closet.

Loft Conversion: Kitchen Work and Shutters

25 - Loft Conversion: Kitchen Work and Shutters

Air Date: February 22, 1999

Work on the restaurant-style kitchen continues, as the wire shelving system is built and the stainless steel range hood is installed.

Loft Conversion: Loft Conversion Final Tour

26 - Loft Conversion: Loft Conversion Final Tour

Air Date: March 1, 1999

A tour of the completed conversion project begins with the building's restored facade and ends with the sixth-floor residential loft.